Mapei Mapelastic AquaDefense Waterproofing
(Price Includes VAT)
Order Now & Get it by 2 days
Sold by: nqcart
Brand : Mapei
Type : Adhesives
Description
Ready-to-use, ultra quick-drying, flexible liquid membrane for waterproofing internal and external surfaces.
WHERE TO USE
To form waterproofing layers before applying ceramic,
stone, mosaic, welded sheet vinyl and LVT coatings
in:
• balconies and terraces;
• bathrooms and shower cubicles;
• laundry rooms;
• saunas and damp environments in general.
Mapelastic AquaDefense may be applied on:
• concrete;
• cementitious screeds and screeds made using
special binders (Topcem Pronto, Mapecem or
Mapecem Pronto);
• plasterboard (for internal applications only);
• fibre cement sheeting;
• existing coatings in ceramic, terrazzo and stone;
• cementitious render.
TECHNICAL CHARACTERISTICS
Mapelastic AquaDefense is a solvent-free, ready to-use ultra-quick drying, one-component light blue synthetic resin based paste in water dispersion. Mapelastic AquaDefense is easy to apply using a long-haired roller, brush or trowel on horizontal, sloping and vertical surfaces. Mapelastic AquaDefense dries very quickly to form
a flexible membrane without a tacky surface. It is resistant to light pedestrian traffic after just 3 hours and forms an excellent grip with all types of adhesives for
laying ceramic, stone material and mosaic of all kinds. The flexible nature of Mapelastic AquaDefense helps it withstand normal movements caused by expansion and shrinkage of the substrate due to temperature variations and vibration.Tiles installed on Mapelastic AquaDefense by using C2F-class MAPEI adhesives (such as Keraquick Maxi S1 or Granirapid.) and grouted with Ultracolor Plus may be opened to pedestrian traffic within 12 hours of starting the work
Brand | Mapei |
Model | Mapelastic |
Type | AquaDefense |
Consistency | Paste |
Density (g/cm³) | 1.30 |
pH | 9.5 |
Minimum Filming Temperature | +5°C |
Recommended Application Temperature | From +5°C to +35°C |
Waiting Time Between First and Second Coat | Approximately 60 Minutes (When dry to the touch) |
Waiting Time Before Laying Coating | 3-4 hours |
Complete Drying of 1 mm (WFT) Thick Layer | 12 Hours |